EV charging stations in Islamabad and Rawalpindi: where to fast charge

On paper, Islamabad ought to be the easiest place in Pakistan to run an electric car. The sectors sit on a tidy grid, distances are short, and ministers keep choosing the capital for charger ribbon-cuttings. In practice, finding a fast charger you can count on still takes a bit of homework.
In early November 2026 we went through the EV charging stations in Islamabad and Rawalpindi one by one, keeping only those backed by the government's registration list, an operator's own website or a news report from the opening. Directory pins and map listings were left out on purpose. What follows is the list we could stand behind, plus a frank account of what nobody has published yet.
What we checked, and what we couldn't
NEECA, the National Energy Efficiency and Conservation Authority, registers EV charging sites, and its published list names the company, the address, the site's registered capacity and how long the registration is valid (NEECA EVCI list). For the twin cities it's the most useful single document there is.
It has two limits. The registration number column is headed "Provisional Certificate/Registration No", and many of the validity dates for Islamabad sites have already passed. That might mean a renewal the list doesn't show yet, or a charger that's no longer running. We can't tell which from the outside.
The other gap is specs. Not one operator we checked publishes the plug type, power per connector, opening hours or price for its Islamabad chargers. Go Green Avenue's locations page, for instance, gives each site an address, a directions link and a call button, and nothing else (Go Green Avenue). So treat every site below as "call first".
EV charging stations in Islamabad, by operator
| Operator | Site | Area | Who confirms it |
|---|---|---|---|
| Go Green Avenue | Centaurus Mall, Basement 2 | F-8/4 | Operator page, NEECA |
| Go Green Avenue | Plot 295, Street 3 | I-9/3 | Operator page, NEECA (different registrant) |
| Attock Petroleum | Plot 63-C, Jinnah Avenue | Blue Area | Attock's website, NEECA, Business Recorder |
| Attock Petroleum | Islamabad Club, main parking | Murree Road | Attock's website, NEECA, Business Recorder |
| Attock Petroleum | Model Filling Station, Plot 32 | F-11 Markaz | NEECA |
| PSO with HUBCO Green | Marwat Filling Station, Plot 2 | I-8 Markaz | ProPakistani, NEECA |
| Gas & Oil Pakistan (Aramco-branded) | Old Embassy Road, Ataturk Avenue | G-6 | Profit, NEECA |
| Gugo Industries (EVX) | Plot 81-G, Street 6 | I-10/3 | NEECA |
| Flash EV Charging Network | Mall 8, Ravi Block, Mumtaz City | Srinagar Highway | NEECA |
| PSO | Capri Gas Station | F-7 Markaz | PSO's website only |
Go Green Avenue lists two sites in our checks. The Centaurus Mall charger is in Basement 2, and NEECA shows a registration for Go Green at the mall that runs to 14 November 2026, ten days from when we read it. The I-9/3 site is in the industrial area, but NEECA registers that plot to a company called Csn Lounge, so whose charger it is, and whether it serves the public or a dealership next door, is something to ask. Go Green opened what the Power Division called Pakistan's first 120 kW fast charger in Islamabad in March 2025 (Express Tribune, March 2025; APP, March 2025), though neither report gives the address, so we can't say which site that was.
Attock Petroleum names Islamabad Club and Jinnah Avenue among its EV charging locations (Attock Petroleum). Its annual report, as covered by Business Recorder, said a charger had been installed at the Islamabad Club and an existing one upgraded at a Blue Area station (Business Recorder, September 2024). The club charger sits in the club's main car park, so ask whether non-members can use it. The F-11 Markaz site shows up only on NEECA's list.
PSO and HUBCO Green run a charger at the Marwat filling station in I-8 Markaz, opened with BYD (ProPakistani, May 2025). PSO's own page also says its first EV charger in the country went in at Capri Gas Station in F-7 Markaz (PSO). The page doesn't date that launch, and we found no recent report showing the charger still works.
Aramco's Embassy Road station in G-6 includes an EV charging point, Profit reported (Profit), and NEECA registers the site to Gas & Oil Pakistan. Gugo Industries has a registration at Plot 81-G in I-10/3, and that's all we could confirm about it. And Flash EV has a current registration at Mall 8 in Mumtaz City, off the Srinagar Highway, which NEECA files under Rawalpindi.

Rawalpindi is thinner on paper
On our checked list, Rawalpindi has just the Flash EV site at Mumtaz City, and only because that's how NEECA files it. The registration list does include more Rawalpindi entries, along GT Road and Airport Road among other places, but we haven't been able to confirm them with an operator or a news report yet. If you live in Pindi, expect to cross into Islamabad for a fast charge for now, or to lean on home charging. The national picture of who runs public chargers looks much the same, with the big cities well ahead of everywhere else.
Reading the kW figures without getting misled
The capacities on NEECA's list look generous, at 120, 150 and even 180 kW. They describe the whole site, though, not the power one plug will give your car. A 180 kW cabinet split across two cables, for instance, may deliver far less to each car than the headline suggests, and your own car sets its own ceiling too.
The figure shows the registrations as printed. We'd read a "current" date as a good sign. A passed one is a reason to phone before you drive across town, since the list can't tell you whether the charger itself still runs.
What a fast charge costs in the capital
None of these operators publishes a per-kWh price for Islamabad. The best guide is the typical figure in 2026 directory listings, about Rs 115 per kWh, within a range of roughly Rs 70 to Rs 200, as we set out in our method for working out running costs. At Rs 115, driving 100 km on fast-charged electricity costs about Rs 2,070.
Don't confuse those prices with the "Rs 71 to Rs 39 per unit" headline from the March 2025 launch. That was a rate cut the minister announced alongside the opening, and Profit described it as a related policy announcement rather than this station's own price (Profit, March 2025).

What to expect when you pull in
Most of these chargers sit on fuel station forecourts or in mall car parks, and each comes with its own quirks. On a forecourt there's usually someone to ask; BYD says the HUBCO Green stations it points its owners to are staffed by trained personnel (BYD Pakistan), which helps on a first visit. In a mall basement, expect the mall's hours and parking rules to apply, and a bay that can be blocked by someone who's gone shopping.
Before your first visit, phone ahead. A club car park or a mall basement raises different questions from a forecourt, so the list below is tailored to the capital's sites. If you've never used a public DC unit, our step-by-step on starting a fast-charging session covers plugs, starting, paying and what to do if nothing happens.

Leaving town on the M-2, or heading up to Murree
Southbound, the M-2 is well covered. TechJuice reported in July 2026 that ultra-fast chargers were running at the Chakri (North), Kallar Kahar (South), Bhera (North and South) and Sial Mor (North) service areas, each able to charge up to four cars at once (TechJuice, July 2026). TechJuice gives only the North and South labels, so check which carriageway a charger serves before you plan a stop around it. HUBCO Green, PSO and BYD also opened 60 kW charging at Magic River, near Lahore, in June 2025; APP reported two chargers, though other reports describe one (APP, June 2025). For pacing the whole Lahore run, see our motorway road-trip plan.
North is a different story. We haven't verified a single public fast charger on the road to Murree or the Galis. NEECA's list does carry two registrations on Murree Road at Bhara Kahu, on the city's edge, one of them Go Green Avenue's, but we couldn't confirm either with an operator page or a news report. A few hotels up there advertise chargers through operator pages, but we haven't confirmed any. So treat Islamabad as your last sure stop. Leave with a full battery, ideally charged overnight at home, and ask your hotel what kind of charger it has before you confirm the room.
Public chargers and shared home chargers in one app
The EVDost app also shows operator-run chargers, marked "Public charger", with directions to the site. You can't request or pay for those through EVDost; you charge and pay at the station, with the operator. Only a few are published so far, so the list above is still the fuller picture. Open the app to see what's near you; public chargers show up alongside the home and business chargers hosts list in the city.
The capital is in better shape than most of Pakistan, and it should get better still now that new petrol stations in Islamabad are to be required to install EV charging, as officials told a National Assembly committee in June (APP, June 2026). Until then, a two-minute call is the difference between a quick top-up and a wasted trip to I-9.
Frequently asked questions
Where can I fast charge an EV in Islamabad?
EV charging stations in Islamabad, as of November 2026, are run by Go Green Avenue (Centaurus Mall in F-8/4 and I-9/3), Attock Petroleum (Blue Area, Islamabad Club and F-11 Markaz), PSO with HUBCO Green (I-8 Markaz), Gas & Oil Pakistan on Embassy Road in G-6, and Gugo Industries in I-10/3. Call before you go, because none of them publishes plug, power or hours.
What should I budget for a fast charge in Islamabad?
Budget about Rs 3,450 for a 20 to 80 percent fast charge on a 50 kWh battery in Islamabad, at the typical Rs 115 per kWh in 2026 directory listings. No Islamabad operator publishes its own price as of November 2026, and directory rates run from roughly Rs 70 to Rs 200 per kWh.
How many Islamabad chargers have a current NEECA registration?
Two of the nine twin-city sites we found on NEECA's EV charging list still had a validity date in the future on 4 November 2026: Go Green at Centaurus Mall (to 14 November 2026) and Flash EV at Mumtaz City (to 26 January 2027). A passed date may mean a renewal the list doesn't show yet.
Is there an EV charger at Centaurus Mall?
Centaurus Mall in F-8/4 has an EV charger, listed by Go Green Avenue in Basement 2, and NEECA shows a Go Green registration there valid to 14 November 2026. Power, price and hours aren't published, so ring ahead and expect mall parking rules to apply.
Which M-2 service areas south of Islamabad have EV chargers?
The M-2 service areas with ultra-fast chargers are Chakri (North), Kallar Kahar (South), Bhera (North and South) and Sial Mor (North), TechJuice reported in July 2026. Check that the one you want is on your side of the motorway before you plan around it.
Sources
- NEECA, EV charging infrastructure registration list (read 4 November 2026): neeca.pk
- Go Green Avenue, charging locations: gogreenavenue.com
- Express Tribune, first 120 kW charger opened in Islamabad (March 2025): tribune.com.pk
- APP, Go Green Avenue inauguration (March 2025): app.com.pk
- Profit, 120 kW station launch and rate announcement (March 2025): profit.pakistantoday.com.pk
- Attock Petroleum, EV charging: apl.com.pk
- Business Recorder, Attock Petroleum EV charging plans (September 2024): brecorder.com
- ProPakistani, BYD charger at PSO I-8 Markaz (May 2025): propakistani.pk
- PSO, electric vehicle charger: psopk.com
- Profit, Aramco station on Embassy Road: profit.pakistantoday.com.pk
- BYD Pakistan, charging guide: byd-mega.com
- TechJuice, ultra-fast chargers on the M-2 (July 2026): techjuice.pk
- APP, Magic River chargers on the M-2 (June 2025): app.com.pk
- APP, licensed stations and Islamabad petrol stations (June 2026): app.com.pk
